Files
craftvia/seed/isms-vorlagenpaket-v2-en/verfahren/VA-04_Change-und-Patch-Management-Verfahren.md
msolarczekandClaude Opus 5 c8e6f30a27
CI / build-and-check (push) Canceled after 0s
CI / audit (push) Canceled after 0s
CI / sbom (push) Canceled after 0s
Basis: Certvia dev@a48c5fb als Fundament für Craftvia
Unveränderter Stand von certvia/dev (a48c5fb) plus Craftvia-Spezifikation
und Brandbook unter docs/craftvia/. ISMS-Module werden im Folgecommit entfernt.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-14 11:05:39 +02:00

2.6 KiB

Change and Patch Management Procedure

Document information Value
Document type Procedure instruction (VA-04)
Scope {{ISMS_SCOPE}}
Organisation {{ORG_NAME}}
Process owner {{ROLE_IT_LEAD}}
Approved by {{ROLE_ISB}}
Version {{DOC_VERSION}}
Date {{DOC_DATE}}
Status {{DOC_STATUS}}

1. Purpose

This procedure governs planned changes to IT systems as well as the risk-oriented installation of patches. It operationalises the associated policy ({{LINK:R10}}).

2. Scope

Applies within the ISMS scope ({{ISMS_SCOPE_DESCRIPTION}}).

3. Trigger

Need for change, available patch or identified vulnerability (VA-06).

4. Inputs

  • Change/patch request
  • Risk assessment
  • Patch SLA (BL-OPS-01)

5. Process

  1. Request & classify the change (standard/normal/emergency) in {{TOOL_TICKET}}.
  2. Risk/impact assessment incl. rollback plan.
  3. Approval by CAB/responsible role.
  4. Test in a separate environment (BL-OPS, R10).
  5. Implementation in production in accordance with the patch SLA (critical {{PATCH_SLA_CRIT}}).
  6. Verification & documentation of the result in {{TOOL_TICKET}}.

6. RACI

# Step R (Execution) A (Accountable) C (Consulted) I (Informed)
1 Request & classify the change Requester {{ROLE_IT_LEAD}} - -
2 Risk/impact assessment incl. rollback {{ROLE_IT_LEAD}} {{ROLE_IT_LEAD}} {{ROLE_ISB}} -
3 Approval by CAB/responsible role {{ROLE_IT_LEAD}} {{ROLE_IT_LEAD}} {{ROLE_ISB}} -
4 Test in a separate environment {{ROLE_IT_LEAD}} {{ROLE_IT_LEAD}} - -
5 Implementation in production per patch SLA {{ROLE_IT_LEAD}} {{ROLE_IT_LEAD}} - Affected parties
6 Verification & documentation of the result {{ROLE_IT_LEAD}} {{ROLE_ISB}} - -

7. Result & evidence

Documented, approved and verified change/patch in {{TOOL_TICKET}}. Evidence is referenced in the central evidence register ({{LINK:NACHWEISREGISTER}}).

8. Key performance indicators (KPI)

  • Patch compliance per criticality
  • Share of successful changes (without rollback)
  • Lead time of critical patches
  • Associated policy: {{LINK:R10}}
  • {{LINK:VA-06}}
  • Technical security baseline: {{LINK:BASELINE}}
  • ISA mapping matrix: {{LINK:ISA_MAPPING}}